21 Oct 2006 |
Textured Paint with Bóveda
A view from the kitchen showing the textured walls with the bóveda. The only remaining interior texturing downstairs is that waiting for kitchen units to be fitted.
|
21 Oct 2006 |
Silicone Treatment of Beams
The I-beams are sanded down and treated with silicone before being repainted with black enamel. The bricks are also sanded down and cleaned with muriatic acid.
|
21 Oct 2006 |
Finishing Off Sloping Roof Edges
Concreting of the sloping roofs has now been completed except for the edges.
|
24 Oct 2006 |
Painting and Texturing of Beams
The beams in the boveda are now painted black, while the 8x5¼ I-beam is textured white so it effectively disappears.
|
24 Oct 2006 |
Start of Floor Tiling
At last work has started on the floor tiles; this is the entrance of the living room. The layout of tiles will be rectilinear on the main areas of the lower floor, and diagonal in the living room and family room.
|
24 Oct 2006 |
Gap in Screen Now Filled In
The gap in the screen has now been filled in so that it is no longer see-through.
|
28 Oct 2006 |
Subfloor Now Nearly Complete
The firme on the upper floor is now complete except for the master bedroom.
|
28 Oct 2006 |
Tiling and Hammered Steps in Living Room
The tiling in the living room is now complete, including grouting and edging (the lower area will have a wooden floor). The steps have been hammered to produce this marbled finish (this is incredibly labor-intensive; each of these steps took nearly two man days). This finish is also being applied to the exterior steps and edge of the covered patio.
|
28 Oct 2006 |
Drywall Alcove in Master Bedroom
Drywall has been used to create this structure around the bed in the master bedroom; it reaches the ceiling and imparts a pleasant curvature to the wall.
|
28 Oct 2006 |
Tiling and Dining Table
Most of the kitchen and dining area has now been tiled; the table top must be hammered and polished, and the base of the table filled in and done similarly.
|
28 Oct 2006 |
Front of House
The front of the house; there has been no exterior texturing yet, and the sides of the sloping roof over the master bedroom still need some work.
|
02 Nov 2006 |
Start of Tiling on Flat Roof
The start of tiling on the flat section of the roof.
|
02 Nov 2006 |
Dishwasher Fittings
Fittings for a dishwasher have now been installed.
|
02 Nov 2006 |
Start of Fitting of Railings
The first of the railings; these must be fitted before the tiles can be laid.
|
02 Nov 2006 |
Floor Tiling Downstairs Nearly Done
All the interior downstairs tiles have now been laid and grouted, except for one or two details that must wait for doors to be fitted.
|
02 Nov 2006 |
Closet Base in Bedroom 2
The base for the closet in bedroom 2; bases for the two cloakroom closets have already been made. Concrete bases will also be made for closets in the dressing room, bedroom 3, and the laundry room.
|
02 Nov 2006 |
Work on Bóveda in Master Bedroom
The master bedroom, with the boveda brickwork being touched up with mortar. The firme (including on the balcony) is now complete.
|
02 Nov 2006 |
Tiling on Roof Underway
More clay tiles have now been placed on the roof. These will later be covered with a cement/silicone mixture, then treated with a water-resistant paint. By the tiles is shown the tool used to smooth out the stucco.
|
03 Nov 2006 |
Tiling Started on Terrace
Tiling has been started on the rear terrace using a more rustic type of tile.
|
04 Nov 2006 |
Tiling on Covered Patio
Most of the covered patio has now been tiled and grouted using the interior tiles.
|
04 Nov 2006 |
Tiling in Master Bathroom Shower
Tiling has also been taking place in the shower cubicle of the master bathroom. A compatible non-slip tile has been chosen for the floor.
|
04 Nov 2006 |
Treated Bóveda in Bedroom 2
The boveda brickwork and beams in bedroom 2 have now been cleaned and treated.
|
07 Nov 2006 |
Even Crazier Improvised Scaffolding
They finally got round to covering these high walls. Each bracket was fixed with one bolt going right through the wall to make this rather precarious platform. Don’t know how they are going to do the overhanging section…
|
08 Nov 2006 |
Tiling in the Study
Tiling has been started in bedroom 3, and here in the study. The bedrooms and study will have a diagonal layout, and elsewhere will be rectilinear.
|
08 Nov 2006 |
Completely Insane Improvised Scaffolding
Here's how they did that overhanging section!
|
09 Nov 2006 |
Flat Roof Areas now Tiled and Sealed
All the flat areas of the roof, including those at the sides of the master bedroom, have now been tiled and covered with impermeabilizante.
|
09 Nov 2006 |
Essential Mexican Laundry Apparatus
This is the lavadero – every Mexican home must have one. From the blue marks on the wall and the two large lugs, it seems installation will involve bashing it into the wall…
|
16 Nov 2006 |
Shower Cubicle Tiling Done
The shower cubicle has now been completely tiled and grouted.
|
16 Nov 2006 |
Installation of Said Apparatus Complete
The lavadero has now been installed and texturing completed; unusually, this one is supported underneath – most are fixed only in the wall behind. A base has been made for the closet and tiling has been completed in the drying patio (awaiting grouting).
|
16 Nov 2006 |
Roof Walls Ready for Texturing
All the walls on the roof are now covered with impermeabilizante ready for texturing.
|
16 Nov 2006 |
Tiling and Installation of Electrical Fittings
The upstairs sitting area has been tiled diagonally to differentiate it from the surrounding passageway. The power and communication points and light switches are being installed. All communication points will support sockets for telephone, TV/radio antenna and LAN.
|
16 Nov 2006 |
Roof Tiles
87 square meters of terracotta tiles have arrived for the sloping roofs.
|
18 Nov 2006 |
Wall Tiles around Kitchen Units
Wall tiles have been fitted in between the kitchen units and around the window. There will be textured paint above the units from a height of 2.2 meters upwards.
|
18 Nov 2006 |
Installation of Lighting and Fittings
The lighting is now being installed together with the light switches and power/communication points.
|
18 Nov 2006 |
Sloping Roofs now Waterproofed
Both sloping roofs have been sealed with a cement/silicone base followed by white impermeable paint, and are now ready for the roof tiles. Textured painting has started in the drying patio and on the walls of the flat roof area.
|
25 Nov 2006 |
Railings and Textured Painting
The straight sections (only) of railing have now been fitted. The rooftop walls have all been textured and work is now in progress texturing the entire exterior.
|
25 Nov 2006 |
Painting of South Walls now Done
The south side of the house, showing that the texturing of the high walls has been done and the scaffolding has been removed.
|